Around here, this spot is called ?the new bridge? even though it was put up
in 1964. That?s 50 years. Some of the people I hike with remember the one it
replaced. The flow on Fordyce Creek varies dramatically with how much is being
released from Fordyce Dam. Yesterday the flow was 30 cfs (cubic feet per second)
but at times can be as high as 400 cfs. That?s why the bridge had to be
replaced...
Art
W3, SPM, PS